The general nature of the improvement consists of four individual project locations where a pond, wetland, or county road project will be constructed on agricultural and municipal county right of way within the Upper Wapsipinicon River Watershed located in Buchanan County, Iowa. The scope of work includes, but is not limited to: mobilization, site preparation, top-soiling, core trench excavation, embankment construction, gravel road reconstruction, concrete box culverts procurement and Installation, corrugated metal pipe procurement and installations, tile investigation, removal, and installation and seeding, mulching and fertilizing. The engineer’s opinion of probable cost for all four projects is approximately $460,000 for all four projects.
UW-BID-006_Advertisement for Bids
Bids Due by 2:00pm, June 10th, 2021 to Shive Hattery, Inc, 4125 Westtown Parkway, Suite 100, West Des Moines, IS 50266
Copies of the contract documents are on file and are available from Rapid Reproductions, Inc., 6015 Huntington Ct NE, Cedar Rapids, Iowa 52402, phone (319) 364-2473, web: [email protected].